How long a bathroom remodel takes in Panama, and what it includes

By Roberto Samudio · Published: November 4, 2026 · Updated: November 7, 2026

A bathroom remodel in Panama usually includes removing what’s there, plumbing, waterproofing, floors and wall tile, the ceiling, electrical work and finishes. How long it takes depends on the size of the bathroom and what’s being changed: the exact timeline is set in a written schedule, in business days, after seeing the space.

What’s included

  • Removal of existing fixtures, tile and sanitary ware.
  • Plumbing: water lines, drains and connections for the sink, toilet and shower.
  • Waterproofing of the floor and shower area before tiling.
  • Porcelain or ceramic tile floors and walls.
  • Custom vanities, ceiling, lighting and paint.

What the timeline depends on

  • The size of the bathroom and how much surface gets tiled.
  • Whether pipes are replaced or only the finishes.
  • Drying times for waterproofing and mortar.
  • Material availability, such as porcelain tile or custom vanities.
  • Building hours, if it’s an apartment.

How to get started

Schedule a free site visit. We see the bathroom and take measurements. After the visit, we send you the proposal in writing, itemized, with scope, exclusions and the work schedule. The time to receive your proposal depends on how many calculations the project requires and how many proposals are in the queue. After the evaluation visit we will tell you the estimated delivery date.

Roberto Samudio. Founder of GenUs Ingeniería. Over 20 years in construction operations and costing in Panama and Central America.

From idea to handover