Remodeling and construction process in Panama City, Panama
From first visit to handover.
No improvising.
A 5-step process so you know what gets done, when, and at what cost. We always see the space before we quote.
Updated: November 7, 2026
-
Free site visit and assessment
Before giving any price, we visit the space. We don’t quote blind, because an estimate without a prior visit can hide surprises. During the visit we take measurements, identify existing conditions, evaluate the real scope of work and flag potential complications. All at no cost and with no obligation.
What you get: a clear assessment of your space and a realistic understanding of the project’s scope.
-
Detailed proposal and transparent estimate
After the visit, we send you the proposal in writing. The time to receive your proposal depends on how many calculations the project requires and how many proposals are in the queue. After the evaluation visit we will tell you the estimated delivery date. Every item is specified: materials, labor, finishes and timeline, with no vague contingencies and no “we’ll fix it later.” If there are more affordable or more convenient alternatives for your case, we present them so you can decide with complete information.
What you get: a written, itemized estimate with scope and exclusions. If hidden conditions that can’t be detected during the visit appear, we tell you and get your written approval before continuing. If the job requires a licensed professional, the proposal says so.
-
Planning and schedule
Once the estimate is approved, we set realistic dates, not optimistic ones. The schedule accounts for material availability, the logical sequence of work and possible setbacks. Timelines are agreed with the subcontractors before we start and are expressed in business days. Before we begin, you know when each phase starts and when the project will be finished.
What you get: a written schedule in business days, with a start date, milestones and an expected completion date. Any adjustment is approved in writing.
-
Execution with periodic supervision
During the work, we provide periodic supervision. We verify that delivered materials match the specifications, that procedures follow current codes and that finishes meet the agreed standards. You get progress reports on the agreed schedule, so you don’t have to wait until the end to find out how it’s going.
What you get: progress reports on the agreed schedule and a project manager for your project.
-
Handover and warranty
When we finish, we do a joint walkthrough with you, point by point. If anything isn’t as agreed, we fix it before closing out the project. At the formal handover, we sign the record. Each product carries its manufacturer’s warranty. Labor follows the project’s specifications and plans and, in their absence, the Panamanian Structural Regulation (REP) in force for the activity. Where the REP does not apply, the manufacturer’s technical data sheet and good trade practices apply.
What you get: a signed handover record. Manufacturer’s warranty on each product; labor per the project’s specifications and plans or, failing those, the REP and the technical data sheet.
Why this process
Designed so everything is in writing
The most common problems in construction and remodeling are predictable. This process exists to prevent them before they happen.
Start with step 1
Schedule your free site visit
No cost, no obligation. We see your space, understand what you need and define the scope with you.